Concrete slabs in the City of Melton
Updated November 2026

Slab work in the City of Melton runs from a 3 by 3 metre garden shed base in a Fraser Rise backyard to a machinery shed floor on acreage at Toolern Vale. The common thread is the ground: the basalt clay plains of Melbourne's west, which shrink and swell with the seasons. We pass your request to a local concreter who works your suburb. We are a referral service, not a concreting business.
Slab jobs we get asked about
- Garden shed and storage bases on new estate lots
- Garage floors and carport slabs, including extensions on township homes
- Granny flat and studio slabs, built to an engineer's design
- Machinery, hay and workshop shed floors at Toolern Vale, Diggers Rest and Eynesbury
- Tank, heat pump and air conditioner pads
- Caravan, boat and trailer pads beside the house
Start with the design, not the concrete
For anything habitable, such as a granny flat or studio, the slab design comes from an engineer, based on a soil report for your block. Soil conditions are assessed per block, not per suburb, so the report matters. If your home is recent, there may be a soil report in the builder's handover documents.
For a shed base, the concreter will usually propose a thickness, steel and edge detail. Ask what they propose and why. Thickened edges, mesh at the right height and a compacted crushed rock base cope with clay movement far better than a thin slab on bare ground.
How the job runs
1. Set-out, levels and fall
2. Excavation, removing topsoil and soft spots
3. Compacted crushed rock base, plus a moisture barrier where the design calls for it
4. Formwork and any edge beams or thickenings
5. Reinforcement on chairs, with cast-in bolts, conduits or plumbing set first
6. Pour, finish, cure and joint
Rock can turn up when digging on the basalt plains. If the excavator hits it, the dig takes longer. Ask how the quote deals with that.
What a slab costs
Guide pricing only. Published 2026 ranges for greater Melbourne put plain concrete at around $75 to $150 per square metre laid, and a double garage or granny flat slab often runs $4,000 to $10,000. Engineered slabs with deep edge beams cost more, while large open shed floors on acreage often price well per metre. The ranges were not re-surveyed for the City of Melton, and the sources do not say whether GST is included. Get a fast quote.
Permits
A granny flat or garage slab is usually part of a building permit. A small garden shed base may not need one, depending on size, siting and use. Building permit requirements in Victoria come from the Building Regulations 2018 and are applied by councils and registered building surveyors. Ask what applies to your job and whether it needs a registered builder, and check the concreter's insurance.
Services underground
Lodge a free Before You Dig Australia (BYDA) enquiry before excavating. Greater Western Water is the water corporation for the City of Melton, and it can provide a property sewerage plan showing its assets at your address. Check your title for easements before you mark out the slab. On acreage, private water lines and any on-site wastewater system are yours to locate.
Acreage slabs
Out at Toolern Vale, Diggers Rest and Eynesbury, shed slabs are bigger and carry heavier loads. Tell the concreter what will sit and drive on the slab, including tractors, trucks or a loaded trailer, because that sets the thickness and steel. Access for the concrete truck across a paddock in winter can be the deciding factor on timing.
Have a size in mind? Get a fast quote.
Frequently asked questions
How thick should a shed slab be?
It depends on what goes on it. A garden shed is very different from a workshop with a car hoist or a machinery shed. The concreter, or an engineer for heavy slabs, will set it.
Can I pour a slab over an easement?
Often not without approval. Check your title and ask the asset owner before planning the slab.
Does a slab need a soil test?
For a habitable building, yes, as part of the engineering. For a small shed base, usually not, but the base and edges still need to suit clay ground.
How soon can the shed go up?
Light framing can often start after a few days. Heavier loads should wait longer while the slab gains strength.